port pool is very adequate for development with a depth of up to 7 – 20 m LWS and a
groove depth of between 15 – 25 mLWS.
Saumlaki Port has several dock segments that are integrated in one faceline with
a total length of 240 m, existing activities serving ship berths include KM Nusantara
Pelangi 101, KM Leuser and Sirimau and KM Sabuk Nusantara 103. To anticipate the flow
of loading and unloading cargo goods, Sea Tolls and Pelni Passenger Ships, it is necessary
to develop facilities and infrastructure with construction work for the construction of
saumlaki port facilities.
Risk management can help increase project awareness, delays in project
construction are often caused by risk factors in projects that have not been identified,
and cause project delays and unexpected cost increases. Each project has different risks
depending on the type of activity and the conditions of the work site, the handling carried
out will be different. Construction delay is defined as the completion time of construction
beyond the date agreed in the contract (Assaf and Al-Hejji 2006).
Sources of risk that fall into the major category include customer or government
sources such as changes in local regulations and bureaucracy. Financial risks such as
changes in the government's fiscal policy. Project risks are like changing the scope of the
project. Project Organization Risks (e.g. Authority to engage in the organization of Project
Leaders. Planning Risks; Regional Situation Risk (Weather); Contractor's Risk as executor
of Contractor Experience and Financial Status. Construction Significant risks to;
occupational risks; risk logistics (site access), inflation risk, risk of price fluctuations and
unavoidable risk (Raaftery, 1994).
(Kenzner, 2005) Risk Management procedures include strategies that are
established at the beginning of the work, and risks are continuously processed throughout
the project life cycle including some relevant behaviors; 1) risk planning is the process of
developing a systematic and comprehensive and interactive strategy and documenting
using risk problems, developing risk transfer planning planning, and identifying and
analyzing risk change monitoring;2) Risk assessment, program programming and risk
identification technology and risk analysis are important in improving performance, and
target costs; 3) Identify risks, program areas and processes to examine important
technical processes to determine and document relevant risks; 4) Processes for
investigating risk system issues that determine the analysis of risks, potential risks and
estimate their impact; 5) Processing is the process of identifying and selecting strategies
to adjust risk to a level of accepting restrictions and program objectives.
Research to identify risks that have the potential to occur during the construction
work of the Saumlaki Port Facility Construction, as well as how to handle it to minimize
delays in project implementation Identify risks to reduce negative impacts that cause
delays in work and have an impact on increasing costs in the implementation of work.