Optimization of Pc500 Unit Rolling to Eliminate Double Cost at PT Antareja Mahada Makmur Jobsite Mifa Bersaudara

Authors

  • Saddam Ihsan Da'im PT Antareja Mahada Makmur
  • Ari Utomo PT Antareja Mahada Makmur
  • Hisyam Maulana Hadi PT Antareja Mahada Makmur
  • Rudy Wijanarko PT Antareja Mahada Makmur
  • Yusfaizi Aditia PT Antareja Mahada Makmur

DOI:

https://doi.org/10.55324/ijoms.v6i1.1332

Keywords:

pc500 excavator, hour meter, rolling unit, double cost, standby cost

Abstract

Uneven operating hours among rented excavators can result in standby charges despite adequate overall equipment utilization, thereby increasing operational costs in mining activities. This study aimed to identify the causes of hour meter imbalances and evaluate an equipment rotation mechanism for eleven PC500 excavators at PT Antareja Mahada Makmur, Mifa Bersaudara Jobsite, under a contractual minimum requirement of 398 operating hours per unit per month. A Quality Control Circle (QCC) approach incorporating the Plan–Do–Check–Act (PDCA) cycle was employed. Operational records from January to May 2026 were used to establish baseline conditions, while corrective measures were implemented and evaluated during June and July 2026. A fishbone diagram analysis identified insufficient supervisory monitoring and the absence of standardized guidelines for equipment rotation and activity allocation as the primary contributing factors. The interventions included routine operational briefings, systematic hour meter monitoring, an activity monitoring dashboard, and a rotation priority matrix developed using existing resources. Excess standby costs decreased from a peak of USD 6,528 in March to USD 145 in June and were eliminated entirely in July, when average operating hours reached 481 per unit. These findings demonstrated that prioritizing underutilized excavators could effectively minimize additional charges resulting from uneven equipment utilization. The interventions required no additional expenditure and were subsequently formalized through a standard operating procedure (SOP). The study concluded that an operating-hour-based equipment rotation strategy improved operational cost control and resource utilization, although a longer observation period is necessary to evaluate its long-term sustainability.

References

Bisschoff, R., & Grobbelaar, S. (2022). Evaluation of data-driven decision-making implementation in the mining industry. The South African Journal of Industrial Engineering, 33(3), 218–232. https://doi.org/10.7166/33-3-2799

Castañón, A. M., Gutiérrez-Diez, J. C., & Bascompta, M. (2024). Analysis of the mining equipment replacement time: A case study focused on drilling rig. Results in Engineering, 24, Article 103057.

Cuya-Acuña, E. M., Villanueva-Salazar, M. B., Arauzo-Gallardo, L. A., & Raymundo, C. (2025). Prevention of accidents by rockfall applying the Deming cycle methodology in an iron oxide copper gold deposit. In Proceedings of the LACCEI International Multi-Conference for Engineering, Education and Technology (LACCEI 2025). https://doi.org/10.18687/LACCEI2025.1.1.1539

Fernandes, R. da S., Sousa, J. C. da C., & Luz, R. M. do N. (2022). Integrated management analysis of production performance, maintenance, and PDCA cycle: A case study of the IPCC mining process. Revista Produção Online, 22(2), 2731–2762. https://doi.org/10.14488/1676-1901.v22i2.4661

Gaspersz, V. (2011). Continuous improvement: Sebuah pendekatan praktis total quality management. PT Gramedia Pustaka Utama.

Hazrathosseini, A., & Moradi Afrapoli, A. (2024). Transition to intelligent fleet management systems in open pit mines: A critical review on application of reinforcement-learning-based systems. Mining Technology: Transactions of the Institutions of Mining and Metallurgy, 133(1), 50–73. https://doi.org/10.1177/25726668231222998

Ishikawa, K. (1985). What is total quality control? The Japanese way. Prentice Hall.

Isniah, S., Purba, H. H., & Debora, F. (2020). Plan Do Check Action (PDCA) method: Literature review and research issues. Jurnal Sistem dan Manajemen Industri, 4(1), 72–81. https://doi.org/10.30656/jsmi.v4i1.2186

Jafari, A. J., Hoseinie, S. H., Bagherpour, R., Mofidi, M., & Ghodrati, B. (2026). Quantifying operational uncertainties in mining machinery fleet productivity using a stochastic Overall Equipment Effectiveness (OEE) analysis. Resources Policy, 114, 105874.

Limbong, G. A. Y., Saismana, U., Triantoro, A., Novianti, Y. S., Prasakto, H. C. D., & Rando, R. D. (2026). Productivity evaluation of excavating and hauling equipment in overburden removal at PT Rimau Energy Mining. Jurnal Himasapta, 11(1), 31–38. https://doi.org/10.20527/jhs.v11i1.18494

Liu, S. Q., Lin, Z., Li, D., Li, X., Kozan, E., & Masoud, M. (2022). Recent research agendas in mining equipment management: A review. Mining, 2(4), 769–790. https://doi.org/10.3390/mining2040043

Lusitania, L., & Razak, S. (2025). Studi nilai effective utilization (EU) terhadap peningkatan produksi pengupasan lapisan tanah penutup tambang batubara. Mining Science and Technology Journal (MINETECH), 4(1), 21–33.

Nguyen, V., Chau, C. K. B., & Tran, T. (2023). PDCA from theory to effective applications: A case study of design for reducing human error in assembly process. Advances in Operations Research, 2023, Article 8007474. https://doi.org/10.1155/2023/8007474

Pavloudakis, F., Roumpos, C., & Agioutantis, Z. (2024). Using overall equipment effectiveness as a driver for improving the productivity of continuous mining systems. Mining, Metallurgy & Exploration, 41(6), 3177–3195.

Pervukhin, D. A., & Tang, L. (2024). Enhancing operational efficiency in coal enterprises through capacity layout optimisation: A cost-effectiveness analysis. Operational Research in Engineering Sciences: Theory and Applications, 7(3).

Prabowo, H., Hutmi, R., & Dewata, I. (2023). Optimizing digging equipment productivity using overall equipment effectiveness (OEE) method in coal overburden mining activities. Invotek: Jurnal Inovasi Vokasional dan Teknologi, 23(2), 99–108. https://doi.org/10.24036/invotek.v23i2.1097

Prasetyo, Y. T., Paradise, M., & Mukarrom, F. (2024). Productivity assessment of digging and loading equipment (Cat 330D2L) and hauling equipment (Fuso 220PS) in coal mining at PT. Bhumi Sriwijaya Perdana Coal, Musi Banyuasin Regency, South Sumatra. Indonesian Journal of Earth Sciences, 4(2). https://doi.org/10.52562/injoes.2024.1226

PT Antareja Mahada Makmur. (2026). Standar operasional prosedur controlling HM unit (No. AMM-MIFA-SOP-ENG-33). Departemen Engineering, Jobsite Mifa Bersaudara.

Rahimdel, M. J., Zahraei, M., & Javanshirgiv, M. (2026). Performance evaluation of open-pit mining equipment using AHP and OEE index. Mining Technology: Transactions of the Institutions of Mining and Metallurgy, 1–18.

Rivai, A. N., & Octova, A. (2021). Analisis optimalisasi loss time alat gali muat untuk mencapai target produksi overburden di Pit Timur PT Allied Indo Coal Jaya Kota Sawahlunto, Sumatera Barat. Jurnal Bina Tambang, 6(4), 248–256. https://doi.org/10.24036/bt.v6i4.114146

Semarajaya, I. K. P., Suparta, I. W. D., & Sudiarta, I. K. (2021). Analisis hour meter terhadap produktivitas dan biaya excavator backhoe PC 78. Jurnal Manajemen Proyek Konstruksi.

Sidinra, A., Wijaya, A. E., & Sumarjono, E. (2022). Optimasi fleet management system (FMS) – Focus guna mengurangi waktu tidak produktif (idle time) pada alat angkut. Mining Insight, 3(1), 43–52.

Waqar, M., Bhatti, I., & Khan, A. H. (2024). AI-powered automation: Revolutionizing industrial processes and enhancing operational efficiency. Revista de Inteligencia Artificial En Medicina, 15(1), 1151–1175.

Zhang, H., Li, B., Karimi, M., Saydam, S., & Hassan, M. (2023). Recent advancements in IoT implementation for environmental, safety, and production monitoring in underground mines. IEEE Internet of Things Journal, 10(16), 14507–14526. https://doi.org/10.1109/JIOT.2023.3267828