RISK MANAGEMENT OF TIME CONTROL ON THE CONSTRUCTION OF SAUMLAKI PORT
DOI:
https://doi.org/10.55324/ijoms.v1i12.239Keywords:
Kinerja waktu, pembangunan pelabuhan, manajemen risikoAbstract
In the development of the port, there are potentially risk factors that are not identified during its implementation, which can affect work delays and add to unforeseen costs, thus requiring handling in accordance with the classification of risks that occur. The risk is in accordance with the type of activity and the environment of the construction project implemented. The study aims to analyze the influential risk factors during the work carried out, based on the perspective of service providers (consultants and contractors) and owners as well as how to handle risks (mitigation) and the effect of the implementation of the Saumlaki Port Facility Construction work on controlling the timing of work. Identifying risks - risks encountered in the study using the interview method against potential risksthat are likely to occur. The survey results show that there are three risks that have a high risk classification from the perspective of service providers that have the greatest impact on project delays. Theconclusion in the research is the need to apply risk management to the implementation of development to minimize delays and reduce unforeseen costs.References
Sopiah et al (2020). Analysis and Risk Response to Building Construction Projects.
Sugiyono. (2019). Quantitative, qualitative, and R&D research methods.
Iswanto et al Risk Management towards Time Control of The Pier Port Construction Project.
Darmawi, Herman (2013). Risk Management, PT. Bumi Askara, Jakarta Han and Diekmann.
Ismisyati et al (2019), Application of Risk Management in the Construction of the Log Pier Extension Project (Case Study: Port in Tanjung Emas Semarang.
Al-Ajmi (2018) , Journal, Risk Management in Constraction Projects.
Indah et al, (2014) , Risk Identification in The Implementation of Development Projects
Piers/Ports In Nusa Penida
Hillson, David, (2002). Use a Risk Breakdown Structure (RBS) to Understand Your Risks, San Antonio, Texas, USA.
Rehacek (2017), Journal Risk Management in Construction Projects
Published
Issue
Section
License
Copyright (c) 2022 Arman Jayady, Edwin Moerdianto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International (CC-BY-SA). that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.